Manage Construction Site Material Store Requests (SIV)
Requisitioning bulk site materials (cement, rebar, aggregates, timber), wastage thresholds, and Model 20 SIV reconciliation.
1. Overview & Business Value#
This comprehensive operational guide details the architecture, business workflows, configuration parameters, and execution steps for Manage Construction Site Material Store Requests (SIV) within SmartERP.


Requisitioning bulk site materials (cement, rebar, aggregates, timber), wastage thresholds, and Model 20 SIV reconciliation.
2. Prerequisites & Security Access Groups#
- Required Modules:
project, smarterp_project_governance, hr_timesheet - Security Groups:
Project User(Technical ID:project.group_project_user)Project Administrator(Technical ID:project.group_project_manager)Timesheet Approver(Technical ID:hr_timesheet.group_hr_timesheet_approver)
- Master Data Dependencies: Project master records, milestone stages, work breakdown structures (WBS), bill of quantities (BoQ), and employee billing cost rates.
3. Step-by-Step Configuration & Execution#
Step 1: Navigating to the Interface#
- Log into your SmartERP instance at
https://smarterp.et/odoo. - Open the main App Switcher (grid icon in the top-left corner).
- Navigate to Project → Projects.

Step 2: Operational Data Parameters & Controls#
Ensure all mandatory parameters comply with enterprise operational standards:
- Authorized Operator: Action executed under assigned RBAC permissions (Project Director, Project Manager, Agile Scrum Master, Lead Engineer).
- Relational Integrity: Linked to upstream master records, approval requests, or transactional ledgers.
- Statutory & Quality Controls: Verified against Ethiopian statutory regulations and corporate governance standards.
Step 3: Operational Execution & State Progression#
- State Progression Gate: Advance record from Draft through Audited to Confirmed / Certified.
- Integrated System Impact: Automatically updates real-time operational states and posts financial/inventory journal moves.
- Audit Verification: System registers tamper-evident audit records logging user ID, timestamp, and cryptographic transaction digests.
Site Material Management#
Bulk construction materials represent up to 60% of total direct project cost. Strict tracking prevents site pilferage, unauthorized transfers, and excessive wastage exceeding theoretical BoQ allowances.
Procedure: Issuing Site Materials#
- Navigate to Projects > Construction > Store Requests (
smarterp_construction_store_request). - Click New.
- Target Element / Work Activity:
Fourth Floor Slab Concrete Pouring. - Materials Requested:
Muger OPC Cement 42.5N: 350 Bags.Deformed Rebar 16mm (Grade 60): 4.8 Metric Tons.Crushed Coarse Aggregate (02): 28 m3.Concrete Sand (Abay): 18 m3.
- Click Verify Against Theoretical BoQ Limit.
- If requested quantity is within the structural design allowance, status updates to
Within Tolerance. - If requested quantity exceeds design by more than 5%, a supervisory justification is mandatory.
- If requested quantity is within the structural design allowance, status updates to
- The Site Storekeeper issues the goods, generating official Model 20 SIV documentation.
4. Advanced Configuration Points#
- Automated Actions & Scheduled Tasks (Crons):
Project: Flag overdue milestone deadlines(project.ir_cron_overdue_tasks): Runs daily to notify project managers of pending schedule delaysTimesheets: Send unsubmitted reminder alerts(hr_timesheet.ir_cron_timesheet_reminder): Runs weekly on Friday afternoon to remind team members
- Custom Print Templates & Reports:
- Project Status & Milestone Execution Scorecard
- Interim Payment Certificate (IPC) for Construction
- Project Timesheet & Resource Utilization Summary
- Earned Value Management (EVM) Financial Report
- Multi-Company Rules: Record-level security isolation under Company 1 (
Ashewa Technology Solutions S.C.), preventing cross-company ledger leakage across parent and subsidiary legal entities.
5. Comprehensive Troubleshooting Matrix#
| Error Symptom / Exception | Probable Root Cause | Corrective Action / Resolution |
|---|---|---|
Access Rights Error: Cannot view confidential task | User is not listed as a project follower or team member. | Add user to Project Privacy Settings or Collaborators tab. |
Validation Error: Timesheet date outside active stage | Attempting to log labor against a closed or cancelled milestone. | Select an active task stage or request reopening of the target work package. |
Billing Rate Error: Missing employee cost rate | Assigned employee lacks an hourly labor cost rate on their profile. | Configure the employee hourly cost rate under Human Resources → Employees → HR Settings. |
Last updated: 2026-11-15