Manage Bills of Quantities (BoQ) and Work Breakdown Structures
Importing engineering BoQs, hierarchical division codes (Earthworks, Concrete, Masonry), unit rates, and quantity takeoffs.
1. Overview & Business Value#
This comprehensive operational guide details the architecture, business workflows, configuration parameters, and execution steps for Manage Bills of Quantities (BoQ) and Work Breakdown Structures within SmartERP.


Importing engineering BoQs, hierarchical division codes (Earthworks, Concrete, Masonry), unit rates, and quantity takeoffs.
2. Prerequisites & Security Access Groups#
- Required Modules:
project, smarterp_project_governance, hr_timesheet - Security Groups:
Project User(Technical ID:project.group_project_user)Project Administrator(Technical ID:project.group_project_manager)Timesheet Approver(Technical ID:hr_timesheet.group_hr_timesheet_approver)
- Master Data Dependencies: Project master records, milestone stages, work breakdown structures (WBS), bill of quantities (BoQ), and employee billing cost rates.
3. Step-by-Step Configuration & Execution#
Step 1: Navigating to the Interface#
- Log into your SmartERP instance at
https://smarterp.et/odoo. - Open the main App Switcher (grid icon in the top-left corner).
- Navigate to Project → Projects.

Step 2: Operational Data Parameters & Controls#
Ensure all mandatory parameters comply with enterprise operational standards:
- Authorized Operator: Action executed under assigned RBAC permissions (Project Director, Project Manager, Agile Scrum Master, Lead Engineer).
- Relational Integrity: Linked to upstream master records, approval requests, or transactional ledgers.
- Statutory & Quality Controls: Verified against Ethiopian statutory regulations and corporate governance standards.
Step 3: Operational Execution & State Progression#
- State Progression Gate: Advance record from Draft through Audited to Confirmed / Certified.
- Integrated System Impact: Automatically updates real-time operational states and posts financial/inventory journal moves.
- Audit Verification: System registers tamper-evident audit records logging user ID, timestamp, and cryptographic transaction digests.
Structure of the Construction BoQ#
The Bill of Quantities (BoQ) is the definitive technical and commercial pricing document governing a construction project. SmartERP organizes BoQ line items in accordance with standard civil engineering divisional standards:
- Division 01: Substructure: Excavation, Bulk Earthworks, Hardcore, Blinding, Reinforced Concrete Footings, Foundation Columns, Grade Beams.
- Division 02: Superstructure: Columns, Suspended Floor Slabs, Shear Walls, Staircases, Structural Steel Roof Framing.
- Division 03: Blockwork & Masonry: HCB Hollow Concrete Blocks (10cm, 15cm, 20cm), Stone Masonry.
- Division 04: Finishes: Plastering, Gypsum Stucco, Ceramic/Porcelain Tiles, Terrazzo, Painting.
- Division 05: MEP Services: Electrical conduits, sanitary drainage, water supply, HVAC.
Procedure: Importing and Managing BoQ Items#
- Open the construction project and click the BoQ Lines smart button.
- Click Import BoQ (Excel / CSV).
- Map columns:
Item No(e.g.,1.04.B).Description(e.g.,Class C-25 Reinforced Concrete in Foundation Columns).Unit of Measure(e.g.,m3).Tender / Contract Quantity(e.g.,480.00).Contract Unit Rate(e.g.,18,500.00 ETB/m3).
- Click Process Import.
- SmartERP automatically establishes the baseline budget envelope and assigns analytic accounts to each division.
4. Advanced Configuration Points#
- Automated Actions & Scheduled Tasks (Crons):
Project: Flag overdue milestone deadlines(project.ir_cron_overdue_tasks): Runs daily to notify project managers of pending schedule delaysTimesheets: Send unsubmitted reminder alerts(hr_timesheet.ir_cron_timesheet_reminder): Runs weekly on Friday afternoon to remind team members
- Custom Print Templates & Reports:
- Project Status & Milestone Execution Scorecard
- Interim Payment Certificate (IPC) for Construction
- Project Timesheet & Resource Utilization Summary
- Earned Value Management (EVM) Financial Report
- Multi-Company Rules: Record-level security isolation under Company 1 (
Ashewa Technology Solutions S.C.), preventing cross-company ledger leakage across parent and subsidiary legal entities.
5. Comprehensive Troubleshooting Matrix#
| Error Symptom / Exception | Probable Root Cause | Corrective Action / Resolution |
|---|---|---|
Access Rights Error: Cannot view confidential task | User is not listed as a project follower or team member. | Add user to Project Privacy Settings or Collaborators tab. |
Validation Error: Timesheet date outside active stage | Attempting to log labor against a closed or cancelled milestone. | Select an active task stage or request reopening of the target work package. |
Billing Rate Error: Missing employee cost rate | Assigned employee lacks an hourly labor cost rate on their profile. | Configure the employee hourly cost rate under Human Resources → Employees → HR Settings. |