Configure Work Centers and Machine Capacity
Setup physical and virtual work centers, working hours calendars, hourly absorption rates, and OEE targets.
1. Overview & Business Value#
This comprehensive operational guide details the architecture, business workflows, configuration parameters, and execution steps for Configure Work Centers and Machine Capacity within SmartERP.


Setup physical and virtual work centers, working hours calendars, hourly absorption rates, and OEE targets.
2. Prerequisites & Security Access Groups#
- Required Modules:
mrp, quality_control, smarterp_manufacturing_costing - Security Groups:
Manufacturing User(Technical ID:mrp.group_mrp_user)Manufacturing Administrator(Technical ID:mrp.group_mrp_manager)Quality Inspector(Technical ID:quality.group_quality_user)
- Master Data Dependencies: Bills of Materials (BoM), routing operations, work centers with machine/labor hourly rates, raw material stock, and inspection checkpoints.
3. Step-by-Step Configuration & Execution#
Step 1: Navigating to the Interface#
- Log into your SmartERP instance at
https://smarterp.et/odoo. - Open the main App Switcher (grid icon in the top-left corner).
- Navigate to Operations.

Step 2: Operational Data Parameters & Controls#
Ensure all mandatory parameters comply with enterprise operational standards:
- Authorized Operator: Action executed under assigned RBAC permissions (Authorized Operator).
- Relational Integrity: Linked to upstream customer, product, inventory lot, or manufacturing order.
- Statutory & Quality Controls: Verified against Ethiopian commercial and tax regulations or technical engineering specifications.
Step 3: Operational Execution & State Progression#
- State Progression Gate: Advance record from Draft through Confirmed to Completed / Posted.
- Integrated System Impact: Automatically updates inventory stock quants, customer receivables, or work-in-progress cost accounting ledgers.
- Audit Verification: System registers tamper-evident audit records logging user ID, timestamp, and cryptographic transaction digests.
Understanding Work Centers#
A Work Center (mrp.workcenter) represents a physical production station, machine, assembly line, or team of specialized workers. In SmartERP, work centers govern two vital operational dimensions:
- Capacity Planning & Finite Scheduling: Preventing line overloading and calculating realistic production finish dates.
- Cost Absorption: Charging hourly machine overhead and labor rates directly to product Work-in-Progress (WIP) accounts.
Procedure: Defining a Work Center#
- Navigate to Manufacturing > Configuration > Work Centers and click New.
- Work Center Name: Enter an identifier, e.g.,
Extrusion Line 04 - HDPE. - Working Hours: Assign a calendar (e.g.,
Standard 48h/Week - 3 Shifts). - Capacity & Efficiency:
- Capacity: Number of parallel units that can be processed simultaneously (default
1.0). - Time Efficiency (%): Target operational efficiency (e.g.,
90.0%). - Setup Time: Standard machine tooling and warm-up time before a batch begins (e.g.,
30 minutes). - Cleanup Time: Post-run maintenance and wash-down time (e.g.,
15 minutes).
- Capacity: Number of parallel units that can be processed simultaneously (default
Costing Parameters#
To ensure correct financial absorption into inventory valuation:
- Cost per Hour: Enter the operational rate in Ethiopian Birr (ETB), e.g.,
850.00 ETB/hr. - Cost Component Breakdown:
- Direct Power Consumption (kWh tariff from Ethiopian Electric Power).
- Machine Depreciation (capital allowance amortized per operational hour).
- Routine Consumables (lubricants, hydraulic oils, filters).

Overall Equipment Effectiveness (OEE) Target Settings#
Set the baseline target (e.g., 85%). Define standard OEE loss reasons:
- Equipment Breakdown (unplanned mechanical/electrical failure).
- Material Starvation (raw materials delayed in warehouse).
- Quality Defects (purging off-spec resin or trimming rejects).
4. Advanced Configuration Points#
- Automated Actions & Scheduled Tasks (Crons):
MRP: Recalculate BoM standard costs(mrp.ir_cron_bom_cost_roll): Runs weekly to update standard costing from latest procurement purchase pricesQuality: Trigger periodic inspection alerts(quality.ir_cron_inspection_check): Runs daily to flag mandatory quality testing queuesWorkcenter: Update OEE statistics(mrp.ir_cron_workcenter_oee): Runs hourly to compute Overall Equipment Effectiveness metrics
- Custom Print Templates & Reports:
- Production Order Traveler & Pick List
- Shop Floor Work Order Execution Slip
- Quality Inspection Certificate & Non-Conformance Report
- Manufacturing Cost Analysis & Variance Ledger
- Multi-Company Rules: Record-level security isolation under Company 1 (
Ashewa Technology Solutions S.C.), preventing cross-company ledger leakage across parent and subsidiary legal entities.
5. Comprehensive Troubleshooting Matrix#
| Error Symptom / Exception | Probable Root Cause | Corrective Action / Resolution |
|---|---|---|
BoM Missing Error: No active Bill of Materials found | Product variant lacks a verified and confirmed BoM in the system. | Create and confirm an active BoM under Manufacturing → Products → Bills of Materials. |
Component Shortage Block: Insufficient stock | Raw material components have not been transferred to the shop floor location. | Execute an internal transfer from main warehouse to production staging location. |
Quality Gate Blocked: Mandatory test failed | Work order failed critical quality tolerance threshold. | Perform required corrective rework or request authorized Quality Manager override. |
Workcenter Capacity Overload | Scheduled production duration exceeds available work center shift capacity. | Adjust scheduled start dates or distribute load across alternative work centers. |