Manage Quality Alerts and Non-Conformance Reports (NCR)
Documenting off-spec production, quarantine disposition, 8D root-cause investigation, and CAPA resolution.
1. Overview & Business Value#
This comprehensive operational guide details the architecture, business workflows, configuration parameters, and execution steps for Manage Quality Alerts and Non-Conformance Reports (NCR) within SmartERP.


Documenting off-spec production, quarantine disposition, 8D root-cause investigation, and CAPA resolution.
2. Prerequisites & Security Access Groups#
- Required Modules:
mrp, quality_control, smarterp_manufacturing_costing - Security Groups:
Manufacturing User(Technical ID:mrp.group_mrp_user)Manufacturing Administrator(Technical ID:mrp.group_mrp_manager)Quality Inspector(Technical ID:quality.group_quality_user)
- Master Data Dependencies: Bills of Materials (BoM), routing operations, work centers with machine/labor hourly rates, raw material stock, and inspection checkpoints.
3. Step-by-Step Configuration & Execution#
Step 1: Navigating to the Interface#
- Log into your SmartERP instance at
https://smarterp.et/odoo. - Open the main App Switcher (grid icon in the top-left corner).
- Navigate to Operations.

Step 2: Operational Data Parameters & Controls#
Ensure all mandatory parameters comply with enterprise operational standards:
- Authorized Operator: Action executed under assigned RBAC permissions (Authorized Operator).
- Relational Integrity: Linked to upstream customer, product, inventory lot, or manufacturing order.
- Statutory & Quality Controls: Verified against Ethiopian commercial and tax regulations or technical engineering specifications.
Step 3: Operational Execution & State Progression#
- State Progression Gate: Advance record from Draft through Confirmed to Completed / Posted.
- Integrated System Impact: Automatically updates inventory stock quants, customer receivables, or work-in-progress cost accounting ledgers.
- Audit Verification: System registers tamper-evident audit records logging user ID, timestamp, and cryptographic transaction digests.
Handling Non-Conformance on the Shop Floor#
When a work order fails a quality test or an operator notices visual flaws, a Non-Conformance Report (NCR) and Quality Alert must be issued immediately.
Procedure: Logging and Investigating an NCR#
- On the active work order or MO, click Quality Alert.
- Subject:
Wall Thickness Below Specification - Heat Batch #8812. - Defect Category: Select
Dimensional Variance. - Root Cause Analysis (RCA):
- Document the 5-Why analysis or Ishikawa fishbone diagram findings.
- Example: Roller hydraulic pressure drop caused by worn seal on Cylinder 3.
- Action Plan:
- Quarantine: Immediately isolate 45 defective pipes in
Quarantine Location. - Corrective & Preventive Action (CAPA): Replace hydraulic seal, recalibrate pressure transducer, and train maintenance shift.
- Quarantine: Immediately isolate 45 defective pipes in
- Disposition Decision:
- Rework: Issue rework order to machine down to smaller pipe diameter.
- Scrap: Discard to recycling bin at scrap metal valuation.
- Concession: Sell as Grade-B commercial stock at a discount.
4. Advanced Configuration Points#
- Automated Actions & Scheduled Tasks (Crons):
MRP: Recalculate BoM standard costs(mrp.ir_cron_bom_cost_roll): Runs weekly to update standard costing from latest procurement purchase pricesQuality: Trigger periodic inspection alerts(quality.ir_cron_inspection_check): Runs daily to flag mandatory quality testing queuesWorkcenter: Update OEE statistics(mrp.ir_cron_workcenter_oee): Runs hourly to compute Overall Equipment Effectiveness metrics
- Custom Print Templates & Reports:
- Production Order Traveler & Pick List
- Shop Floor Work Order Execution Slip
- Quality Inspection Certificate & Non-Conformance Report
- Manufacturing Cost Analysis & Variance Ledger
- Multi-Company Rules: Record-level security isolation under Company 1 (
Ashewa Technology Solutions S.C.), preventing cross-company ledger leakage across parent and subsidiary legal entities.
5. Comprehensive Troubleshooting Matrix#
| Error Symptom / Exception | Probable Root Cause | Corrective Action / Resolution |
|---|---|---|
BoM Missing Error: No active Bill of Materials found | Product variant lacks a verified and confirmed BoM in the system. | Create and confirm an active BoM under Manufacturing → Products → Bills of Materials. |
Component Shortage Block: Insufficient stock | Raw material components have not been transferred to the shop floor location. | Execute an internal transfer from main warehouse to production staging location. |
Quality Gate Blocked: Mandatory test failed | Work order failed critical quality tolerance threshold. | Perform required corrective rework or request authorized Quality Manager override. |
Workcenter Capacity Overload | Scheduled production duration exceeds available work center shift capacity. | Adjust scheduled start dates or distribute load across alternative work centers. |
Last updated: 2026-11-15